House Extension in North London: How Much Does It Cost?

 

(2025)

Curious about extending your home in North London? This thorough guide covers 2025 extension costs, planning permission, building regulations, work timelines, and more.

Lågt pris
Snittpris
Högt pris
House Extension in North London: How Much Does It Cost?

If you want a quote for the work, click the button below, and we'll connect you with quality-assured craftsmen, matched specifically for your project. It only takes a minute to get started, and it's completely obligation-free. Read more about the service here!

Looking for a contractor? Get 3 quotes

It only takes a few minutes and is completely non-binding

Start here

How Much Do House Extensions in North London Cost?

Extension costs in the UK can vary significantly, shaped by how large or detailed your plan is, the structural intricacy involved, and the materials you choose. Industry research often puts a single-storey rear extension at about £1,500 per square metre for the simplest builds, while standard expansions commonly occupy the £1,800–£2,500 per square metre range. If you incorporate more advanced steel beams, architect-designed glazing, or top-tier finishes, you may see costs surpass £3,000 per square metre.

In North London, which includes boroughs like Camden, Islington, Haringey, and parts of Barnet, labour charges tend to be on the higher side, reflecting strong demand and desirable neighbourhoods. If you own an older Victorian or Edwardian property, for instance in Highgate or parts of Finchley, foundational or structural reinforcements could push up your total bill. Larger-scale expansions often land between £40,000 and £100,000+, while smaller side or rear additions might be more economical. Multi-level or ultra-luxury designs can exceed typical cost levels if complex engineering or top-tier interior choices are used. Adding a kitchen or bathroom always increases your spending, given the plumbing, wiring, and waterproofing needs.

When you gather contractor quotes, make sure each one clarifies foundation work, structural assembly, roofing, fixtures, finishing, and labour overhead. Also confirm if VAT—commonly 20%—is factored in or separate. Although renovation websites and magazines offer ballpark figures, genuine accuracy requires obtaining multiple bids from established builders, then comparing them methodically line by line.

Different Types Of Extensions

There are also different requirements for different extensions. Under is a list of the different types of house extensions:

Side extensions
Single storey extensions
Extensions more than one storey

They each have their own specific limits concerning such as rear extensions requirements, height, roofing and windows. For extensions of more than one storey, there is for example a requirement that roof pitch must match the existing house as far as practicable.

Would you like quotes on your project? Get 3 offers.

North London

North London covers a wide and varied stretch, including boroughs like Barnet, Camden, Enfield, Haringey, and Islington. Areas such as Highgate, Finchley, and Muswell Hill showcase older, characterful homes, while neighbourhoods around Holloway and Tufnell Park have Victorian or Edwardian terraces suited for single-storey rear or side-return expansions. In more modern pockets of Enfield or Barnet, semidetached properties might adopt double-storey layouts, creating ample space for growing families. Loft conversions remain popular throughout, converting pitched roofs into usable bedrooms or offices. Basements do occur in certain premium streets near Highgate or Hampstead, though they require more engineering scrutiny.

Local contractors point out that North London roads near major hubs—like Camden Town or Highbury & Islington—can be heavily congested, so scheduling skip deliveries during quieter times (like midmorning) is recommended. Labour costs generally track high due to the popularity of these areas. A well-managed extension can significantly improve day-to-day living and property value, especially near strong public transport lines (like the Northern line, Victoria line, or Overground). If you share boundaries in terraced or semidetached housing, discussing plans early with neighbours helps avoid last-minute friction or party-wall disagreements.

Whether you aim for a simple single-storey design to open up your kitchen-diner or a more elaborate multi-floor renovation in a Victorian terrace, tailoring your build to North London’s local environment and the relevant borough’s planning guidelines typically paves the way for smoother approvals.

Looking for a contractor? Get 3 quotes

It only takes a few minutes and is completely non-binding

Start here

Getting Started

Prior to breaking ground, choose which extension arrangement suits your North London house. Single-storey rear expansions often unify cramped ground-floor spaces, giving a modern open-plan kitchen-dining-living area. A double storey approach doubles these gains by adding bedrooms or bathrooms upstairs. Alternatively, a side extension can reclaim an alley or driveway, while a loft or basement might be a viable choice if outward expansions are restricted—though basements in North London typically appear in higher-value roads near Highgate or Hampstead.

Detailed planning up front reduces unexpected slowdowns. Formulate a thorough budget referencing average labour fees and material costs, plus a margin for structural or finishing extras. If your scheme includes substantial structural modifications—like removing large load-bearing walls—an architect or experienced building designer may be essential. Certain building companies offer design-and-build, but they generally require partial drawings or planning consents for accurate quotes. Many North London owners bring in an architect first, then contact preferred contractors.

It’s often beneficial to finalise your contractor well in advance, as top-tier trades can have busy schedules. Obtaining multiple estimates early helps you dissect cost differences, check references, and choose a builder you trust. A knowledgeable team might refine your plan—for example, positioning rooflights strategically for extra sunlight or adding pocket doors to separate living zones neatly.

Would you like quotes on your project? Get 3 offers.

Project Management

You typically organise an extension in one of two ways:

  • Single contract (design-and-build or main contractor)
    You enter one contract with a main contractor who handles everything, from foundation excavation to finishing, subcontracting trades as needed. They usually charge 10–15% for coordination. This method streamlines scheduling and contact, giving you one entity to communicate with.
  • Multi-trade or split contract
    You yourself hire groundworkers, carpenters, roofers, plumbers, electricians, etc. While you skip a main contractor’s markup, you also juggle each trade’s timeline. If one trade lags behind, subsequent tasks are idle, raising cost or stress. This model works if you have the time and a solid knowledge of building processes.

For larger expansions in North London, the single-contractor route commonly appeals, especially for owners with limited free time. If you opt for multi-trade, ensure you can check the site weekly to maintain alignment of deliveries, tasks, and schedules.

Do I Need Planning Permission?

Whether you need planning permission depends on your extension’s size, height, and how it sits on your plot. Under Permitted Development (PD) Rights, you can sometimes extend without lodging a formal planning application, if you comply with designated dimension limits. If you exceed them, you normally file a householder planning permission request.

Under are the general rules that apply to all extensions:
Only half the area of land around the "original house" can be covered by extensions or other buildings.
Extensions cannot be higher than the highest part of the existing roof; or higher at the eaves than the existing eaves.
Where the extension comes within two metres of the boundary the height at the eaves cannot exceed three metres.
Extension cannot be built forward of the ‘principal elevation’ or, where it fronts a highway, the ‘side elevation’.
The work cannot include:
verandas, balconies or raised platforms.
a microwave antenna (e.g. TV aerial or satellite dish).
a chimney, flue or soil and vent pipe.
any alteration to the roof of the existing house.
On Article 2(3) designated land the work cannot include cladding of the exterior.
The materials used in any exterior work must be of a similar appearance to those on the exterior of the existing house.
Source: Planning Portal.

Given North London’s many conservation areas—like Highgate Village or Hampstead Garden Suburb (though that last part is in Barnet)—some expansions require more stringent approvals. Consulting your specific borough’s planning department early can clarify if PD rules cover your build or if you must apply formally.

Do I Need Planning Permission For A New Storey?

Loft conversions altering roof lines or inserting dormers usually need planning permission. Still, you could add an entire new storey under permitted development if you follow exacting standards and submit a prior approval to the borough planning office. Otherwise, Householder/Full Planning Permission is your route. If your property meets the criteria, read the bullet points below for the restrictions:

Number of additional storeys:
One storey can be added to a single storey house
Two storeys can be added if the house has more than one storey.

Height increases:
The house cannot exceed 18 metres in total height
Each added storey cannot add more than 3.5 metres to the total height
If not detached (e.g. terrace or semi) the total height cannot be more than 3.5 metres higher than the next highest building that the house is attached to, adjoins, or is in the same row as.
The additional storeys must be constructed on the principal part of the house*
The additional storeys must not exceed 3 metres in height or the height of any existing storey in the principal part of the house (measured internally from floor to ceiling)
Engineering operations must only include works within the existing curtilage of the house to strengthen existing walls and foundations
The materials used must be of a similar appearance to those used in the construction of the exterior of the current house
Windows must not be placed in any wall or roof slope forming a side elevation of the house.

Additional rules may apply after completion. In many North London terraced roads, preserving consistent rooflines or exteriors can be key to winning planning approval.

Do I Need Planning Permission For A New Basement?

Generally, building a basement requires planning permission, and extensive excavation is also likely to do so because of its large scope. It’s prudent to consult your borough’s planning officers early to ascertain local restrictions. Basements often rank among the most complex and expensive expansions, so even if planning permission isn’t triggered, Building Regulations remain mandatory for safe structural conditions, ventilation, fire prevention, etc.

Check local constraints that can outweigh PD expansions. Some streets in Highgate or Muswell Hill, for instance, might limit basement potential. Asking your borough council or a planning consultant is wise to confirm feasibility in North London.

While basements are more common in extremely high-value roads around Hampstead or Highgate, some property owners in Finchley or Crouch End also consider them if outward expansions aren’t feasible. Be prepared for higher budgets, advanced engineering, and possible party-wall discussions.

Remember Building Regulations Application

Regardless of the size and shape of your extension, it must meet building regulations requirements. This is also regardless of whether you need planning permission or not.

You will need to submit a building regulations application. For smaller projects you can submit a Building notice but for larger extensions you’ll probably need a Full Plans Application. In this case, you send complete details of your proposed work to get approval before starting. With a Building Notice, an inspector will review and approve the work in progress.

Keep in mind that certain tasks involving electrics, heating, plumbing, or windows might be handled by certified professionals under Competent Person Schemes (for example, NICEIC for electrical tasks or FENSA for replacement windows). This allows them to self-certify compliance, rather than having individual building control inspections for each of those jobs.

A Full Plans Application typically identifies design or structural issues early, while a Building Notice can suffice for modest expansions. Whichever path, your extension must receive final sign-off from building control confirming code adherence.

What’s The Difference Between Planning Permission And Building Regulations Application?

Whereas planning permission assesses whether the extensions meets local and national requirements, building control focuses on the structural soundness and compliance with safety regulations.

Even if your extension in North London qualifies under PD or doesn’t need a formal application, you still need to prove building regulations compliance—for example, ensuring secure foundations, insulation, damp protection, and so forth. With older Victorian or Edwardian properties found in areas like Holloway or Tufnell Park, verifying your new structural loads remain safe is crucial.

Would you like quotes on your project? Get 3 offers.

DIY Contribution

Homeowners sometimes plan to tackle certain aspects of an extension themselves. Painting, decorating, or external landscaping can be fine DIY tasks if you have the necessary proficiency. Doing your own demolition, to a limited extent, may also be possible—if you accurately determine load-bearing walls and follow basic safety steps.

However, areas involving gas lines, electrical wiring, or major structural changes nearly always require licensed experts. Mistakes can threaten occupant safety or result in big rework costs. Evaluate your skill set honestly; taking on too much can cause delays. Builders might have to wait if your DIY portion overruns, climbing the final bill. If you prefer some partial DIY, consulting a professional first can avert big setbacks.

In North London, partial DIY commonly revolves around finishing touches once the main shell and mechanical tasks are done—like painting walls or minor gardening. Attempting advanced structural or engineering tasks yourself risks failing official checks or reducing overall build quality.

Do I Need An Architect?

If your planned extension is small or fairly straightforward, a structural engineer or building designer might suffice. But for a larger, more intricate project, an architect typically brings real advantages. Skilled architects ensure functional layouts, consistent design themes, and a smooth interface between the old and newly extended spaces.

They can also advise if your idea is permitted under PD or if planning permission is likely. While employing an architect elevates upfront costs, it often saves headaches later by avoiding poorly planned designs.

North London includes Victorian terraces in Tufnell Park, 1930s semis in Finchley, and modern developments near places like Colindale. An architect can help unify older exteriors with a clean, contemporary interior addition, possibly introducing large glass walls, partial skylights, or open-plan partitions for modern living.

How Long Does It Take To Build An Extension?

Building a realistic timeline for your extension is vital for maintaining order. A smaller single-storey rear extension—provided it’s straightforward, typical materials, and PD-sanctioned—might wrap up in just weeks once the site is prepped. Larger expansions, multi-floor or multi-room, might last from a few months to half a year or beyond, depending on engineering complexity and the number of trades.

Sometimes, you might relocate briefly if load-bearing walls are removed or services severed. Even if you stay home, dust, noise, and certain off-limits rooms will characterise your daily routine.

Always add flexibility for potential delays. Heavy rain or winter conditions can slow outside building, inspectors may demand minor plan changes, or deliveries might come late. Coordinating a pragmatic schedule with your contractor eases stress, and if the extension wraps up sooner, that’s a welcome bonus. Likewise, keep a financial contingency for hidden structural concerns or elevated finishing preferences that may surface mid-project.

North London sees congestion near popular roads or transport nodes, such as Holloway Road or Archway. Booking skip or supply deliveries outside peak times is typically recommended. Changing finishes or structural specifics during the build also shifts completion further out.

House Extensions Step By Step

Though launching an extension is a major undertaking, with thorough planning, skilled trades, and a coherent budget, you can succeed. Whether you aim to enlarge a kitchen-lounge, add extra bedrooms, or carve out a basement, it helps to monitor each stage and typical pitfalls.

  1. Start by confirming what you want to achieve—more natural light, a larger social area, or additional bedrooms.
  2. Then decide how best to organise the project.
  3. Check if you need planning permission and what kind of building regulations application you need to send in.
  4. Gather quotes from at least three builders if possible, ensuring each has a solid track record and good references.
  5. Check that their quotes are like-for-like in terms of scope.
  6. Factor in the cost of planning applications, building control fees, and professional services such as architectural drawings or structural engineering.
  7. Then develop a realistic schedule, communicate frequently with your chosen contractor, and keep a close eye on both time and budget.
  8. Finally, as the build nears completion, consider a thorough inspection—often called a snagging survey—conducted alongside your main contractor or an independent professional. Resolve any outstanding details before final payment. Keep building control certificates, warranties, and relevant compliance records for potential sale or mortgage updates.

When your North London extension completes and is signed off, you can enjoy a bigger, more functional living environment. Whether you introduced a bright rear family room or added a second storey with new bedrooms, the improvement often heightens both comfort and property desirability—particularly near strong transport links like the Northern line or Overground stops. A snagging survey identifies subtle finishing defects (like hairline cracks or uneven paint lines) so your builder can fix them. Storing building control approvals and warranties validates regulatory adherence, reassuring lenders or prospective buyers. In the end, you can embrace your newly expanded North London property for years to come, well-suited to your changing household.

Looking for a contractor? Get 3 quotes

It only takes a few minutes and is completely non-binding.

Start here

Keep reading:

Get started

Find trusted builders. Receive and compare quotes.