How Much Do House Extensions in Hillingdon Cost?
In the UK, house extension costs vary considerably, shaped by how large your extension is, which materials you choose, and the difficulty of construction. Based on industry numbers, a single-storey rear extension might begin about £1,500 per square metre for an uncomplicated design, whereas most expansions settle around £1,800–£2,500 per square metre. Adding high-spec steel beams, specialist glazing, or luxury décor could push totals beyond £3,000 per square metre.
In Hillingdon, which sprawls across outer west London near Heathrow and beyond, labour fees generally stay somewhat below central-London peaks, but older or listed buildings—such as those in certain conservation areas near Uxbridge or Ruislip—may require extra structural measures, raising final costs. Broader expansions often occupy a £40,000–£100,000+ bracket, while narrower side or rear designs could be cheaper, and multi-level or lavishly finished projects can exceed regular ranges if complex engineering or top-grade materials are demanded. Adding a kitchen or bathroom always inflates the figure, courtesy of plumbing, electric, and waterproofing needs.
When contrasting contractor quotes, check that each includes foundation digging, structural framing, roofing, fixtures, finishing, labour, and management overhead. Ensure VAT—commonly 20%—is included or excluded in the price. Though home-improvement websites and renovation magazines provide ballpark figures, genuine accuracy arrives from collecting multiple estimates from reputable building teams and comparing them item by item.
Different Types Of Extensions
There are also different requirements for different extensions. Under is a list of the different types of house extensions:
Side extensions
Single storey extensions
Extensions more than one storey
They each have their own specific limits concerning such as rear extensions requirements, height, roofing and windows. For extensions of more than one storey, there is for example a requirement that roof pitch must match the existing house as far as practicable.
Hillingdon
Hillingdon, the second-largest London borough by area, comprises diverse neighbourhoods such as Uxbridge, Ruislip, Hayes, and Northwood, each reflecting various housing eras. Homeowners in Ruislip might add single-storey rear additions for open kitchen-lounges, while those in Uxbridge sometimes adopt side expansions if the property layout supports it. Loft conversions also surface in pitched-roof semis or terraces, turning attic space into new bedrooms or study rooms. Basements appear in certain higher-value enclaves or near older estates, though the ground conditions in some parts of Hillingdon can make excavation more challenging.
Local builders caution that traffic around Uxbridge town centre or along the A40 can complicate skip deliveries, so scheduling them off-peak is a norm. Labour costs in Hillingdon generally range from moderate to somewhat higher than average outer-London rates, particularly if the property is near Heathrow or high-demand areas. A well-crafted extension can improve day-to-day comfort and property appeal, especially if you live near tube stations like Uxbridge or Ruislip. Alerting neighbours early helps if your house shares fences or walls, preventing friction over boundary lines.
Whether you want a small single-storey design to expand your kitchen-diner or a more comprehensive, multi-floor layout adding bedrooms, aligning your extension with Hillingdon’s suburban ethos and planning regulations will usually smooth out approvals.
Looking for a contractor? Get 3 quotes
It only takes a few minutes and is completely non-binding
Getting Started
Before building, decide which extension type fits your home. A single-storey rear build might unify separate kitchen and dining spaces, while a double storey plan extends both ground and upper floors. Alternatively, a side extension can recapture a narrow side alley, and a loft or basement might apply if outward expansions are constrained. Basements in Hillingdon aren’t especially common but can be found in prime roads if ground conditions permit.
Robust planning from the outset generally saves time later. Outline a detailed budget, factoring in likely labour fees, standard materials, plus a contingency for structural complexities or upmarket finishes. If you propose extensive structural reconfiguration, think about hiring an architect or experienced designer. Some builders do design-and-build but need initial sketches or partial planning consent to quote accurately. Many Hillingdon residents consult an architect initially, then seek builder estimates once they have preliminary drawings.
It’s also prudent to secure a contractor early, as good local teams can fill their schedules fast. Gathering quotes soon lets you compare cost breakdowns, call references thoroughly, and pick a builder you trust. An experienced firm might refine your scheme—for instance, adding an extra rooflight for more daylight or partitioning an open space to include a separate utility area.
Project Management
Extensions typically follow one of two primary models:
- Single contract (design-and-build or main contractor)
You sign just one agreement with a building firm that oversees everything—foundation digging, structural construction, plumbing, electrics, roofing, and finishing—and often subcontracting specialist trades, taking about a 10–15% management fee. This simplifies scheduling, offering one key contact if issues emerge. - Multi-trade or split contract
You personally hire groundworkers, carpenters, roofers, electricians, plumbers, etc. You might forgo a main contractor’s overhead, but you must coordinate each trade’s timeline. If any trade is late, subsequent tasks might stall, leading to possible cost overruns or stress. This approach is best if you have ample free time and some construction acumen.
For substantial or intricate expansions in Hillingdon, the single-contractor model often appeals, easing daily oversight. If you do multi-trade, confirm you can frequently visit and manage deliveries on time.
Do I Need Planning Permission?
Whether planning permission is needed depends on your extension’s volume, height, and where it’s placed on your property. Under Permitted Development Rights, you can sometimes build without a formal application if you stay within size and placement rules. If the design surpasses these, you typically submit a householder planning permission application.
Under are the general rules that apply to all extensions:
Only half the area of land around the "original house" can be covered by extensions or other buildings.
Extensions cannot be higher than the highest part of the existing roof; or higher at the eaves than the existing eaves.
Where the extension comes within two metres of the boundary the height at the eaves cannot exceed three metres.
Extension cannot be built forward of the ‘principal elevation’ or, where it fronts a highway, the ‘side elevation’.
The work cannot include:
verandas, balconies or raised platforms.
a microwave antenna (e.g. TV aerial or satellite dish).
a chimney, flue or soil and vent pipe.
any alteration to the roof of the existing house.
On Article 2(3) designated land the work cannot include cladding of the exterior.
The materials used in any exterior work must be of a similar appearance to those on the exterior of the existing house.
Source: Planning Portal.
Because Hillingdon includes conservation areas—such as Northwood’s historical sections—some homeowners face extra constraints. Check with local planning officers first to clarify if your idea fits PD or if you must apply.
Do I Need Planning Permission For A New Storey?
Loft conversions involving dormers or heightening the roof typically demand planning permission. However, you may add a new storey under permitted development if you adhere to strict standards and file a prior approval with the local authority. Otherwise, Householder/Full Planning Permission is needed. If your property meets these conditions, see the bullet points below:
Number of additional storeys:
One storey can be added to a single storey house
Two storeys can be added if the house has more than one storey.
Height increases:
The house cannot exceed 18 metres in total height
Each added storey cannot add more than 3.5 metres to the total height
If not detached (e.g. terrace or semi) the total height cannot be more than 3.5 metres higher than the next highest building that the house is attached to, adjoins, or is in the same row as.
The additional storeys must be constructed on the principal part of the house*
The additional storeys must not exceed 3 metres in height or the height of any existing storey in the principal part of the house (measured internally from floor to ceiling)
Engineering operations must only include works within the existing curtilage of the house to strengthen existing walls and foundations
The materials used must be of a similar appearance to those used in the construction of the exterior of the current house
Windows must not be placed in any wall or roof slope forming a side elevation of the house.
Further rules might apply upon finishing. In Hillingdon’s suburban roads with consistent rooflines, ensuring your new storey blends is often a priority.
Planning Permission: New Basement?
Creating a new basement generally needs planning permission, and heavy excavation beneath your house is also likely to require planning permission given its magnitude. It’s advisable to speak with your local planning office early on, clarifying any relevant guidelines. Basements are inherently complex, so even if no direct planning application is mandated, Building Regulations definitely apply, covering structure, fire safety, damp measures, and more.
Check if local constraints override normal PD expansions. Specific zones in Hillingdon, particularly near Ruislip’s older areas or near the Grand Union Canal, may have special rules. Council resources or a planning consultant can confirm if your basement plan is viable.
Some homeowners in prime roads near Northwood or Uxbridge might add basements where outward expansions aren’t an option, albeit with higher costs for ground surveys and potential party-wall negotiations.
Building Regulations Application
Regardless of the size and shape of your extension, it must meet building regulations requirements. This is also regardless of whether you need planning permission or not.
You will need to submit a building regulations application. For smaller projects you can submit a Building notice but for larger extensions you’ll probably need a Full Plans Application. In this case full details of the proposed work will be submitted for approval before the work begins. With a Building Notice an inspector will inspect and approve the work as it is performed.
A Full Plans Application can pinpoint design or stability oversights early, while a Building Notice might suffice for a simple single-storey design. In either approach, you must get final approval from building control verifying that the build meets codes.
Difference Between Planning Permission And Building Regulations Application?
Whereas planning permission assesses whether the extensions meets local and national requirements, building control concerns structural safety and regulations compliance.
Even if your Hillingdon extension aligns with PD rules, building regulations remain essential to confirm foundation solidity, proper insulation, fire checks, and so on. Since many 1930s semis or older homes exist in the borough, verifying that your structural updates are safe is crucial.
DIY Contribution
Homeowners sometimes ponder taking on parts of an extension themselves. Painting, decorating, or landscaping can be fine DIY projects if you have enough know-how. Doing your own demolition, to some extent, may also be possible—so long as you understand which walls carry loads and follow all health and safety steps.
However, tasks such as installing gas lines, rewiring electrics, or modifying structural supports generally require specialists. Mistakes can become dangerous or prompt costly remedial work. Accurately assessing your skill is vital; overcommitting can delay schedules. Builders might hold off on their tasks until you finish your segment, bumping up overall costs. If you want to do some DIY, it’s wise to get professional advice first to avoid large missteps.
In Hillingdon, partial DIY commonly surfaces once the shell is up—letting the homeowner decorate or complete finishing touches. Attempting advanced mechanical or structural tasks personally could jeopardise official inspection deadlines or reduce overall build quality.
Do I Need An Architect?
If your extension is relatively minor, a structural engineer or building designer can suffice. Yet for more expansive or sophisticated undertakings, an architect offers considerable benefits. A trained architect considers practical layout, daylight, and blending old and new spaces into a cohesive plan.
They can also advise whether your concept stays within PD or must go through planning permission. While an architect raises initial costs, it frequently mitigates design errors and yields a more polished final outcome.
Hillingdon stretches across suburban zones, from semi-detached estates near Hayes to modern developments around Uxbridge, often with big back gardens. An architect can guide you in utilising garden space effectively or bridging older exteriors with contemporary interior expansions, possibly adding wide sliding doors or partial glass roofs to bring in more natural light.
How Long Does It Take To Build An Extension?
A workable timetable helps you remain organised. A smaller single-storey rear job—especially if straightforward, uses standard materials, and permitted under PD—might complete in weeks once groundwork starts. Larger expansions, multi-floor or multiple rooms, can range from a few months to half a year or more, shaped by structural complexity and how many trades participate.
Occasionally, you might need to move out temporarily if critical walls are torn down or main utilities cut. Even if you stay, anticipate noise, dust, and some room closures during building.
Include a buffer. Poor weather may halt exterior operations, inspectors might request slight changes, or deliveries could arrive late. Coordinating a realistic schedule with your contractor lowers stress, and concluding earlier than anticipated is a pleasant surprise. Similarly, a financial contingency can offset unplanned tasks or design changes mid-project.
Hillingdon sees heavy traffic near key arteries like the A40 or M4, so skip drop-offs often occur outside peak commute periods. Switching finishes or structural components after the build begins can also stretch out your final date.
Step By Step
Though undertaking an extension is significant, with detailed planning, dependable tradespeople, and a rational budget, it can move forward successfully. Whether you want to extend for a new open-plan kitchen-lounge, a loft bedroom, or a basement level, it pays to watch each phase and common stumbling blocks.
- Start by confirming what you want to achieve—more natural light, a larger social area, or additional bedrooms.
- Then decide how best to organise the project.
- Check if you need planning permission and what kind of building regulations application you need to send in.
- Gather quotes from at least three builders if possible, ensuring each has a solid track record and good references.
- Check that their quotes are like-for-like in terms of scope.
- Factor in the cost of planning applications, building control fees, and professional services such as architectural drawings or structural engineering.
- Then develop a realistic schedule, communicate frequently with your chosen contractor, and keep a close eye on both time and budget.
- Finally, as the build nears completion, consider a thorough inspection—often called a snagging survey—conducted alongside your main contractor or an independent professional. Solve any final defects prior to paying in full. Retain building control approvals, warranties, and any compliance certificates for possible mortgage or sale enquiries.
Once your extension achieves final clearance, you can appreciate a more spacious and functional home in Hillingdon. Whether you opened up the ground floor for a brighter kitchen-diner or added an extra upstairs bedroom, the improvements generally raise day-to-day comfort and potential market interest. A snagging survey identifies minor cracks or off-kilter finishes so your contractor can address them. Storing building control records and warranties indicates adherence to all regulations, reassuring prospective buyers or lenders. Ultimately, your newly expanded Hillingdon property should suit your evolving lifestyle for years to come.