How Much Do House Extensions Cost?
Prices for house extensions in the UK vary substantially, linked to the design’s size, materials, and overall complexity. Data suggests a single-storey rear extension might start near £1,500 per square metre for a simple plan, whereas many average expansions fall between £1,800–£2,500 per square metre. If you incorporate advanced steel beams, custom glazing, or premium fittings, you may find that expenses edge beyond £3,000 per square metre.
In Chelsea, one of London’s most affluent areas, labour costs are high, but you’ll also find highly skilled trades proficient with intricate or heritage aspects. Some older Georgian or Victorian buildings can need substantial structural reinforcements, pushing your budget upward. Typically, a larger extension sits around £40,000 to £100,000+, though a narrower or simpler side return may cost less, and double- or multi-storey expansions surpass usual ranges if lavish finishes or extensive steel engineering is required. Bear in mind that a new kitchen or bathroom means plumbing, waterproofing, and electrics—often significantly raising the total.
When collecting estimates, verify each contractor covers foundation excavation, structural framework, roofing, fixtures, finishing, plus labour overhead. Check if VAT—commonly 20%—is included. General references in renovation media supply ballpark figures, but exactness comes from soliciting multiple bids from established builders and examining each item in detail.
Different Types Of Extensions
There are also different requirements for different extensions. Under is a list of the different types of house extensions:
Side extensions
Single storey extensions
Extensions more than one storey
They each have their own specific limits concerning such as rear extensions requirements, height, roofing and windows. For extensions of more than one storey, there is for example a requirement that roof pitch must match the existing house as far as practicable.
Chelsea
Chelsea, within the Royal Borough of Kensington and Chelsea, is noted for its upscale streets, historic architecture, and desirable postcodes. House extensions here frequently serve to blend older facades with updated internal spaces. Single-storey rear builds can open a smaller kitchen into a bright entertaining area, while side extensions re-purpose narrow exterior passages in classic terraced houses. In some high-value residences, basements are added to secure extra living room, though these demand extensive planning and structural checks. Loft conversions similarly appear if outward expansions clash with limited garden footprints.
Local contractors remind that parking and road space can be tight near the King’s Road or Sloane Square, so skip drop-offs or supply deliveries typically avoid peak hours. Labour in Chelsea is among the city’s costliest, but the borough’s premium trades often handle listed buildings or refined design details well. Conservation area rules can be stringent, especially near the Thames or in areas like Cheyne Walk, meaning detailed external guidelines for expansions. Successfully completed work often boosts property appeal significantly in a district known for high-end real estate. It also helps to liaise early with adjacent owners or property management if your building shares walls or is part of a terraced row.
Whether you intend a modest kitchen enlargement or an ambitious multi-storey concept, tailoring your design to Chelsea’s sophisticated style usually proves beneficial, aiding both local authority approvals and final architectural harmony.
Looking for a builder? Get 3 quotes
It only takes a few minutes and is completely non-binding
Getting Started
Before you start, decide precisely which form of extension suits your Chelsea home. A single-storey rear expansion could unify living and cooking spaces, a double storey layout might add more upstairs, and a side or wrap-around design uses corner or alley space. Alternatively, a loft or basement might be your best route if the property lacks outward building room. Basements in Chelsea, while often desired, remain complex because of potential neighbouring foundations and engineering demands.
Up-front planning is key. Prepare a thorough budget by referencing market rates for trades and materials, leaving funds for potential structural complexities or premium finishes in line with the area’s upscale norms. If major reconfiguration is planned, hiring an architect or reputable designer is wise. Some construction firms do design-and-build, but they commonly require early sketches or partial consents to produce accurate estimates. Often, Chelsea owners commission an architect first, then gather quotes from a short list of contractors skilled in high-spec or heritage builds.
You should also seek a contractor well ahead of time, given that the borough’s top building teams can be fully booked. Gathering estimates quickly ensures you can evaluate cost breakdowns, confirm references, and pick a firm that suits your goals. Experienced contractors may even refine your plan—such as introducing hidden storage solutions or pivoting a staircase location to amplify space.
Project Management
Extensions are generally managed via one of two main strategies:
- Single contract (design-and-build or main contractor):
You contract a single builder who coordinates all tasks—foundations, carpentry, electrics, plumbing—and subcontracts as needed, usually adding a 10–15% markup on those trades. This system eases scheduling headaches and provides one main contact. - Multi-trade or split contract:
You handle the entire arrangement yourself, dealing separately with groundworkers, bricklayers, roofers, electricians, plumbers, and so forth. While you could skip the main contractor’s overhead, you bear project management duties. Any slip-up in scheduling by one trade can stall the entire timeline.
For complex or high-end designs in Chelsea, many owners opt for a single contractor, especially if they have limited time and want a streamlined process. If you go multi-trade, verify that you can allocate sufficient hours to orchestrate each trade’s tasks and deliveries carefully.
Do I Need Planning Permission?
Deciding if planning permission is required depends on the extension’s size, height, and property placement. Under Permitted Development Rights, you might enlarge a house without a formal application, as long as the plan remains within certain boundaries. However, if your proposal extends beyond those parameters, a householder planning permission application is usually needed.
Under are the general rules that apply to all extensions:
Only half the area of land around the "original house" can be covered by extensions or other buildings.
Extensions cannot be higher than the highest part of the existing roof; or higher at the eaves than the existing eaves.
Where the extension comes within two metres of the boundary the height at the eaves cannot exceed three metres.
Extension cannot be built forward of the ‘principal elevation’ or, where it fronts a highway, the ‘side elevation’.
The work cannot include:
verandas, balconies or raised platforms.
a microwave antenna (e.g. TV aerial or satellite dish).
a chimney, flue or soil and vent pipe.
any alteration to the roof of the existing house.
On Article 2(3) designated land the work cannot include cladding of the exterior.
The materials used in any exterior work must be of a similar appearance to those on the exterior of the existing house.
Source: Planning Portal.
In Chelsea, part of the Royal Borough of Kensington and Chelsea, conservation areas and listed terraces are widespread, meaning even modest external shifts might require thorough scrutiny. Always confirm with local planning staff if your expansion meets PD or calls for an application.
Do I Need Planning Permission For A New Storey?
Loft extensions that add dormers or raise the roof height commonly need planning approval. Still, constructing an additional storey might be categorised under permitted development if you satisfy strict conditions and submit a prior approval request to the local authority. Otherwise, you’ll file Householder/Full Planning Permission. If your property fits these guidelines, the following bullet points indicate core restrictions:
Number of additional storeys:
One storey can be added to a single storey house
Two storeys can be added if the house has more than one storey.
Height increases:
The house cannot exceed 18 metres in total height
Each added storey cannot add more than 3.5 metres to the total height
If not detached (e.g. terrace or semi) the total height cannot be more than 3.5 metres higher than the next highest building that the house is attached to, adjoins, or is in the same row as.
The additional storeys must be constructed on the principal part of the house*
The additional storeys must not exceed 3 metres in height or the height of any existing storey in the principal part of the house (measured internally from floor to ceiling)
Engineering operations must only include works within the existing curtilage of the house to strengthen existing walls and foundations
The materials used must be of a similar appearance to those used in the construction of the exterior of the current house
Windows must not be placed in any wall or roof slope forming a side elevation of the house.
Upon completion, further stipulations might apply. In Chelsea’s exclusive streets, verifying with the borough’s planning department is crucial so that you don’t disrupt a meticulously uniform terrace roofline.
Do I Need Planning Permission For A New Basement?
Building a new basement generally requires planning permission, and large-scale excavation below ground level is also likely to demand planning permission due to extensive works. It’s advisable to approach your local planning authority from the start to clarify the guidelines. Basement construction is inherently complex, so even if a formal planning consent isn’t strictly mandated, Building Regulations still apply to guarantee structural robustness, safe exits, proper ventilation, fire standards, and so on.
Make sure you investigate any local regulations that could apply to your property or zone. In some cases, a normally permitted extension can be curtailed by prior local planning decisions. Familiarise yourself with council directives or consult a planning specialist for thorough clarity.
In Chelsea, below-ground expansions can be highly sought after, especially when outward or upward additions are limited. Yet they’re frequently more expensive because of deeper groundworks, as well as potential water table or neighbouring foundation worries.
Remember Building Regulations Application
Regardless of the size and shape of your extension, it must meet building regulations requirements. This is also regardless of whether you need planning permission or not.
You will need to submit a building regulations application. For smaller projects you can submit a Building notice but for larger extensions you’ll probably need a Full Plans Application. In this case full details of the proposed work will be submitted for approval before the work begins. With a Building Notice an inspector will inspect and approve the work as it is performed.
Choosing a Full Plans Application can highlight design or structural concerns in advance, whereas a Building Notice might be adequate for simpler tasks. Either method culminates in building control approving your extended property for compliance.
What’s The Difference Between Planning Permission And Building Regulations Application?
Whereas planning permission assesses whether the extensions meets local and national requirements, building control concerns structural safety and regulations compliance.
Even if your Chelsea extension doesn’t need planning permission under PD guidelines, you still have to follow building regulations for safe foundations, suitable damp-proofing, and more. In an area boasting many heritage terraces, verifying structural reliability is often critical.
DIY Contribution
Homeowners sometimes consider tackling parts of an extension themselves. Painting, decorating, or landscaping can be good DIY tasks if you have the skills and time. Doing your own demolition, to an extent, can also be feasible—provided you understand which walls are load-bearing and follow safety precautions.
However, tasks such as electrical installation, gas connections, and structural changes almost always require qualified professionals. Mistakes in these areas can be costly and dangerous. Being realistic about your abilities is crucial; if you overcommit, you risk causing delays. Builders may need to pause until you finish a particular job, which can add to your final bill. If you’re determined to do some work yourself, consider hiring a professional for a consultation, as their input can help you avoid pitfalls.
In Chelsea, partial DIY typically means handling décor or garden finishing, letting experts handle potentially hazardous or intricate tasks such as rewiring or heavy structural changes. This approach keeps timelines intact and ensures safety.
Do I Need An Architect?
If your extension is modest, a structural engineer or design pro might be enough. Nevertheless, for larger or more complex undertakings, an architect can be immensely valuable. A capable architect weighs appearance, interior flow, and practicalities like natural light, while also guiding how your new space merges with existing rooms and any outdoor space.
They can further assist with clarifying whether you stay under permitted development or need planning consent. While hiring an architect raises initial costs, that investment often pays off by preventing layout blunders and achieving a balanced result.
Chelsea is home to elegant townhouses, stucco-fronted terraces, and prime real estate. An architect’s insight may help you blend a modern extension into a heritage facade, specifying top-tier materials or smart window placements that uphold local aesthetic standards.
How Long Does It Take To Build An Extension?
A well-organised timeframe lets you manage the build. A small single-storey rear addition—if straightforward and using standard materials—may be wrapped up in a few weeks, especially if it sits under permitted development. More expansive multi-level expansions with advanced structural design may run from several months to half a year or more, depending on your chosen layout and how many trades are needed.
In some cases, you may have to move out temporarily if essential load-bearing walls are removed or utilities must be shut off. Even if you stay in the property, dust, noise, and blocked-off areas might be your everyday norm.
Allow for a buffer. Delays can arise from severe weather, modifications required by building inspectors, or materials arriving behind schedule. Planning a realistic timeline with your contractor reduces stress, and if things finish early, so much the better. Similarly, keep a contingency fund in your budget for any structural surprises or design changes.
Chelsea sees frequent parking and traffic limitations, particularly near the King’s Road or Sloane Square, so skip drop-offs in off-peak windows typically make sense. If you alter finishes mid-project or request special imported materials, your completion date might shift further.
House Extensions Step By Step
Though adding an extension is a big venture, with careful organisation, qualified workers, and a prepared budget, it can succeed. Whether you’d like a refined new kitchen-diner, a basement living space, or an enhanced upper floor, you must stay aware of each stage and typical stumbling blocks.
- Start by confirming what you want to achieve—more natural light, a larger social area, or additional bedrooms.
- Then decide how best to organise the project.
- Check if you need planning permission and what kind of building regulations application you need to send in.
- Gather quotes from at least three builders if possible, ensuring each has a solid track record and good references.
- Check that their quotes are like-for-like in terms of scope.
- Factor in the cost of planning applications, building control fees, and professional services such as architectural drawings or structural engineering.
- Then develop a realistic schedule, communicate frequently with your chosen contractor, and keep a close eye on both time and budget.
- Finally, as the build nears completion, consider a thorough inspection—often called a snagging survey—conducted alongside your main contractor or an independent professional. Make certain any unfinished details are fixed before final payment. Store building control approvals, warranties, and other evidence of compliance safely, as mortgage lenders or potential buyers may require them in future.
After your extension has official clearance and the final checks pass, you can relish a more spacious, functional home. Whether you installed a sun-drenched kitchen-living area or dug out a basement leisure room, the changes commonly elevate both comfort and potential resale value. In Chelsea, one of London’s most prestigious boroughs, a tastefully integrated extension is likely to draw interest from discerning purchasers if you opt to sell later. Perform a snagging survey to catch small blemishes—like hairline cracks or uneven paint lines—so the contractor can rectify them. Archiving the compliance paperwork shows future stakeholders that your project followed all standards. With that, your newly enlarged Chelsea home will be well equipped to meet your evolving household needs for years to come.